
Future Projects
Project |
Estimated cost of Project |
| PRANAHITHA-CHEVELLA LIFT IRRIGATION SCHEME, PACKAGE-17:
Consisting of lined gravity canal, CM & CD wrks and tunnel with carrying capacity of 87.21 Cumecs from Tipparam Reservoir to Chevella Reservoir Main Canal - Reach-1 from Tipparam Reservoir to Gundureddipalli (V) from Km.0.000 to Km.24.120 |
64697 |
|
Upgradation of the Road from Davangere to Birur from Km.0.000 to Km.105.630 of SH-76 |
20200 |
|
Excavation & construction of Two tunnels at Chainage 18660 to 19600 & 23370 to 29990 with Bllastless track and construction of road bed from Km.17/0 to 35/0 including Earth work in formation, major and minor bridges for new broad guage railway line (Obulavaripalle to Venkatachalam) in Kadapa district. A.P. |
26919 |